At some time these tests should be done at site at the time of maintenance. Now if the transformer is multi tap then to take the
voltage ratio and other tests at site is being time worthy process as well it indeed also man power. With help of our client's
feedback, we had developed Transformer Routine Test Set to test these test accurately and with the minimum time and man
We are manufacturer of Electrical parameter Testing and Measuring
Instruments. Our technical team has its full attention on continuous up
gradation of our instruments. We keep full attention on instrument - not
about only the measuring accuracy of it, but the instrument should be
completely user friendly. We had keep our eyes on Transformer Testing
Instruments and hence our product range is related with Transformer
Manufacturers, Transformer Repairing Agencies as well users.
TM
R
Blt yumt ytEo mte
ISO 9001 : 2008
ISO 9001 : 2008
OTHER PRODUCTS
TM
"TESTING INSTRUMENTS"
Add: 7, Valam Nagar Soc., Nr. Kshama Soc., A.K.Road, Surat, Gujarat - 395008, INDIA
E-mail: info@testset.in / Web: www.testing-instruments.in
power required. There are some logical connection done in the Test Set and the one time wiring with Transformer
bushings and then switching the supply from Test set for one test to other test. There are some meters to measure
different parameters at the top of panel. The complete instrument is enclosed in MS powder coated cabinet. The
enclosure is such design to suit it with the industrial application. There are dual door in the enclosure for control
cable and power cable itself.
If some time it is indeed to have a No load loss test of transformer, then we had settled arrangement for it.
At that time the user will need the appropriate capacity Variac and connect it with the Test Set at indicated connector
and it is ready for No load loss test.
Price: